From Measure to Water Test in Barton Creek
The crew that installs your windows measures them first, opening by opening, and notes which walls take afternoon sun and which face the street. Then we confirm the governing association and read its current guidelines, because rules and forms change.
Because a committee reviews the window itself, we specify the frame, the finish, the glass makeup and any divided-lite pattern in writing before a quote is final, and the colour you approve is the colour we order. For a new wall of glass facing the greenbelt or a door wall cut into a rear elevation, the committee needs drawings, not a brochure, so we produce the front, side and rear elevations, the written estimate and the specification it reads, and we build exactly what it approves.
You approve the specification, the samples and the elevations. We assemble the package the committee asks for, and nothing is ordered until the approval is in hand. Where Travis County or another authority also needs a permit, that is identified at the same time.
On install day each old unit comes out, the new one goes in over a sill pan with flashing to the manufacturer's written instructions, and every opening is water-tested before the trim goes back on. The job closes with a written warranty.